(402) 376-2833

News

2025 Cherry County Fair

Friday, August 1 1:00 p.m. CST - .22 Silhouette and Target Shoot-Off at Cherry County Fairgrounds 6:30 p.m.

4-H State Speech results

The Nebraska 4-H Premier Communication Event features a variety of state-level communication contests. The two-day event was held at the on the University of Nebraska-Lincoln East Campus in Lincoln June 19-20, 2025.

Flying Unicorn Pie

Ingredients: Egg wash (or almond milk if making a vegan pie) Brown gel food color Vanilla extract Assortment of sanding sugar, sprinkles, and small Sixlets or dragées Gold and pearl luster dust Vodka or any clear alcohol or extract to mix with the luster dust Supplies: The pie pan of your choice Baking sheet Parchment paper Food-safe precision knife Pastry brush Food-safe artist brushes Ramekins or small containers to mix color and hold egg wash Fondant sculpting tool (or toothpick) 1. Roll out the dough of your choice onto parchment and cut out all the Flying Unicorn template pieces with a sharp knife. Cut out as many “rays” as you like.

MNNRD Saturated Thickness Map

The color coded map above lays out the amount of remaining saturated thickness using hydrogeological well logs to determine total feet of saturated thickness and inputing the static water level measurements the NRD takes every spring and fall. This shows the positive or negative change in the aquifer and gives you an “amount of aquifer remaining”. The percentages above showcase the percentage of aquifer remaining in each section. The minimum amount of aquifer remaining anywhere in the MNNRD is 96.5%, and there are numerous places where there is nearly 120% of the original aquifer. Data from 2009-2025 gives the best data set for district wide modeling.

Ainsworth Irrigation District update

Hazard Engineering recently finished a second feasibility study in the AID to evaluate and improve irrigation operations. The study focused on the entire AID distribution system and solutions for capturing system waste and re-timing flows for irrigation use.

Cub Creek Recreation Area renovations

The MNNRD along with the City of Springview and NE Game andParksCommissionarelooking into several proposed renovation projects at Cub Creek Recreation Area including: • Handicap Accesible Toilet • Floatable Fishing Pier • Boat Dock • Boat Ramp • Bank Stabilization • Improved Road Access A Letter of Intent has been sent to the NE Game and Parks to start the beginning planning stages..

Long Pine Creek watershed restoration project update

The MNNRD and Houston Engineering are addressing threats to water quality, streambed channel, aquatic habitat and infrastructure within the Long Pine Creek Watershed (LPCW) by implementing Best Management Practices (BMP) within the LPCW along with three, in-stream restoration projects on Sand Draw Creek.

Staff and Board of Directors

General Manager Mike Murphy, Administrative Assistant Rick Joseph, Watershed Coordinator Chandler Schmidt,Water Programs Coordinator Kyle Temple, Natural Resources Coordinator James Battershaw, Natural Resources Technician Josh Purdy, Natural Resources Technician Travis Reagle.

Plum Creek Fire signup through August 15, 2025

FSA is still holding signups until August 15, 2025, for the Emergency Conservation Program (ECP) to help farmers and ranchers recover from the Plum Creek Wildfire in April 2025. ECP provides financial and technical assistance to repair damaged farmland including debris removal, replacing fences, restoring conservation structures, field windbreaks/shelterbelts, and water sources.

*New Irrigated Acres *

The MNNRD will be accepting applications for up to 3,000 new irrigated acres or equivalent high capacity uses for 2025. Applications will be accepted from August 1, 2025, to August 31, 2025, at the MNNRD Office.